Song Hau 1 thermal power plant project

  • SONG HAU 1 POWER THERMAL PLANT

    Song Hau Power Plant 1 of Song Hau Power Center located at Phu Xuan village, 
    Mai Dam town, Chau Thanh district, Hau Giang province,
    with total capacity of 1,200 MW with 2 units (2x600MW).
    Total area: 115 ha. 
    Address: Hau Giang Province, about 12 km away from CanTho City toward Hau River 
    downstream, about 180 km away from Ho Chi Minh City.
    Its coordination are 09056’22’’ – 09057’49’’ North Latitude, and 105050’20’’ – 105051’51’’
    East Longitude.

    Total investment:  2.
    1 Billion USD
    Owner: 
    Vietnam Oil and Gas Group (PVN)
    Representative: PMB Song Hau Power Project 1
    Consultants:
    Fichtner Gmbh & Co.KG & PVE (PMC)
    EPC contractor:
     General Vietnam Machinery Erection Corporation (LILAMA)

    Consultants: Tokyo Electric Power Services Company Limited (TEPSCO)
    Sub Contractor for soil improvement:
    Vietnam oil and gas construction and

    Vietnam Geotechnical Engineering  JSC. (PVC-GEOVIETNAM)

    LANDSCAPE LAYOUT PLANT OF SONG HAU 1 THERMAL POWER PLANT

    GENERAL PLOT PLANT

     

    Soil improvement method: PVD combined with vacuum preloading and surcharge preloading method.

    Soil improvement work:
    Area:   ̴ 37 ha
    PVD depth: 20m   ̴ 26m
    Clay sealing wall: 17 ~21 m
    Vacuum pressure: 70kPa
    Additional surcharge: 2m
    Technical specification :
    Service load: Main power island 80kPa,
                           Coal storage yard, BOP and other: 50kPa
    Consolidation settlement: 160cm - 180cm
    Consolidation degree: > 95%

    CONSTRUCTION ACTIVITIES 


    Sandmat filling


    Clay sealing wall


    PVD installation


    Installation of monitoring instruments


    Horizontal drainage pipes

    Geotexttile


    Geomembrane

    Flycam : Geomembrane


    Vacuum pumps