Cast-in-place concrete large - diameter pipe pile

  • I - METHODOLOGY AND MAJOR PARAMETERS

    -
    Vibration and penetrating double casing to design depth
    -
    Pouring concrete in to the gap between inter and outer casings, pile is formed once the annular casing is vibrated and withdrawn.



    II. ADVANTAGES
    - Pile lenght could be over 25m (typical use ≤25m )
    - Outer diameter of pile is from 1.0m to 1.5m, thickness of pile wall is from 0,12 to 0,15m
    - Pile spacing is from 2.5D to 4D
    - Concrete grade ≥ B20
    -
    Large diameter and high length
    - High bearing capacity and stabilily
    - Simple construction method

    - Ease of quality control and quality inspection, hing reliability

    - Competitive cost

    - Save construction time

    - Low residual settlement after improvement
    - Codes for design, construction, inspection and approval have been officially issued

    III. CONSTRUCTION

    IV. QUALITY CONTROL AND INSPECTION

    STT

    PARAMETERS

    VALUE

    METHOD

    1

    Pile length

    +30mm

    Length of casing, site minute

    2

    Concrete filling coefficient

    ≥1.1

     

    Real volume of concrete

    3

    Pile position

    ± 200mm

     

    Check coordination of pile

    4

    Inclination

    < 1%

    Inclination meter

    5

    Pulling speed of cassing

    Soft ground

    0.6 – 0.8m/min

    Measuring of pulling time and distance of cassing movement

    Good ground

    0.6 – 0.8m/min

    6

    Quantity of pile wall

    Design

    Sampling and testing and small strain test (PIT)

    7

    Bearing capacity

    Design

    Static loading test


    V. SCOPE

     

    VI. TYPICAL PROJECTS USING PCC PILE:



  • Related Services

    Vacuum preloading method

    The mothodoly of this method is that a vacuum pressure is created by vacuum system, and soil mass is isotropically compressed.. ...

    Surchage combined with PVDS preloading method

    Quality preload combined with absorbent sponge make faster consolidation occurs for two main reasons. The ...

    T-shape cement column deep mixing

    T-SHAPE CEMENT DEEP MIXING COLUMN is an advanced technology for soil ... ...

    Supply and installation of geomaterials

    Supply and installation of ...

    Geology investigation, monitoring work, laboratory and in-situ test

    Geology investigation, monitoring work ...

    Reuse of dredrings for geomarterials

    A sheer scale of dredging materials is disposed annually. ...