Solution - Services

Projects include expanding repositories - Ca Mau Fertilizer Plant

  • EXPANSION PROJECT STORAGE CONTAINERS - Ca Mau Fertilizer Plant
    1. Area: 2 ha
    2. Processing Technology: PCC Pile
    3. Specification:
         + 22.0 m long piles
         + 1.2 m diameter
         + Pile wall thickness: 0.12 m
         + Load user: 3 -7.5 T/m2
         Subsidence + balance: Less than 10 cm/10 years

    PICTURES OF THE CONSTRUCTION






    PCC pile construction machines




    PCC pile construction

    PCC pile examination